To access this element change to forms mode OFF

Closed ATM View - MD2621

Development of a Building Blocks Model and Efficiency Assessment of River Murray Operations

Contact Details

Bodie Schwab-Orr

:
02 6279 0100

:

:

:
MD2621
:
Murray-Darling Basin Authority
:
80101504 - Strategic planning consultation services
:
28-Feb-2014 5:00 pm (ACT Local Time)
Show close time for other time zones
:
29-Jan-2014
:
ACT, NSW, VIC, SA
:
Request for Tender

:
No

:

The project is to (1) develop a building blocks model of River Murray Operations (RMO), and (2) undertake a rigorous efficiency assessment of RMO to establish the efficient cost base as input to the building blocks model in accordance with the requirements of the Water Charge (Infrastructure) Rules (WCIR).

:
 

All enquiries for this Request for Tender must be directed to the contact officer via email.

:

Conditions for participation are outlined in Schedule 1, Item 3 - Conditions for Participation.

Responses to this Request for Tender that do not contain sufficient information as required and detailed in the documentation may not be considered.

 

:

The contract is intended to commence in the 4th QTR of the 2013-2014 financial year.

The timeframe for delivery is outlined in Schedule 1, Item 7 - RFT Timetable.

:
www.tenders.gov.au

Contact Details

Bodie Schwab-Orr

: 02 6279 0100

:

: