Closed ATM View - RFT 10020759
For the Provision of a Covered Outdoor Learning Area (COLA) at Norfolk Island Central School (NICS)
Contact Details
Project Director, Territories Capital and Major Projects
:
-
Engagement of a Head Contractor to design, supply and construct a Prefabricated Covered Outdoor Learning Area (COLA) for the Norfolk Island Central School Norfolk Island.
The works include: construction of new water capture and storage tank and all works associated with water capture system.
All associated electrical power supply and lighting works.
The Tenderer must comply with all Conditions of Participation as set out in Clause 2.2 Conditions of Participation of Section 2. Response Requirements (General) of RFT Documentation Part A.
The Contract is expected to be executed on or about 31 May 2021.
Construction, decommissioning and close out phase due in September 2021.