Closed ATM View - DNP-BNP-1920-125-004
Murrays Boardwalk Replacement
Murrays Boardwalk at Booderee National Park provides pedestrian access beside the road to Murrays Beach Boat Ramp and Murrays Beach from the associated car parking area.
The Director of National Parks is approaching the market to engage a contractor to remove and replace the existing boardwalk in line with the drawings attached to this RFT. Installing lights and upgrading the drainage at the car park end of the boardwalk is also included in the scope of works.
(Additional Keywords: Construction, pre-fab, pre-fabrication, deck, decking, FRP, stairs, structure, beach, walkway, indigenous, tourism, builder, building, metal work, project, infrastructure, asset, demolition, civil, NSW, Jervis Bay, structure, aluminium)
The Tenderer exists as a legal entity at the Closing Time (see paragraph 8.3).
The delivery date will be negotiated with the Contractor. The delivery date should not be later than 31 May 2022.