Port Hedland Channel Marker Project
The project is to replace the Port Hedland water sections of the thirteen (13) seaward Port Hedland aids to navigation (AtoN) channel markers. The work is necessary due to the age of the upper structures, damage sustained in Tropical Cyclone Veronica in 2019 and the requirement to raise the light above the storm wave height and into alignment with the inshore beacons. The overall scope includes design development of the AMSA concept, fabrication, construction and commissioning of the Aids to Navigation.
Please note: this is a pretender notice only and that all documents and related information will not be available untill the Tender is released in May 2021.
• Marine Contractor
AMSA seeks to award the project to an Engineering, Procurement and Construction (EPC) marine contractor with proven capability and resources operating in-accordance with a certified integrated management system (IMS).
• OFSC Accreditation
Tenderers will require accreditation with the Office of the Federal Safety Commissioner (OFSC). The accreditation must be achieved by the closing date of the Tender to be considered.
• Construction Vessel
The nominated construction vessel / barge must be able to maintain position without an anchored mooring system. Vessels to be typically a jack-up barge or dynamically positioned.
The anticipated date for project completion is June 2023.