Road Design at Christmas Island National Park

Contact Details

Gareth Jones

:

:
CINP-PAI2122-710
:
Director of National Parks
:
81100000 - Professional engineering services
:
5-Nov-2021 2:00 pm (ACT Local Time)
Show close time for other time zones
:
5-Oct-2021
:
WA
:
Request for Tender

:
No
:
No
:
No

:

The purpose of the works to be performed by the contractor are for the design development of new road systems and drainage, new cycle paths, new crab barriers along the roadside and crab bridges on Christmas Island. A key part of the project is the design and development of a prototype for the crab barrier system to manage crab movements during their migration period.  Design hold points will be at 30% Concept Design, 50% Schematic Design (for the crab barrier prototype) and 90% Detailed Design.

:

The Customer will exclude from consideration any Response that does not meet the following Mandatory Conditions for Participation:

Supplier must exist as a legal entity

:

ATM Closing Date:

1 November 2021

ATM Closing Time:

14:00 ACT local time

Question Closing Date and Time:

Questions will be permitted up until 16:00 ACT local time Friday, 22 October 2021.

Expected Contract Execution Date:

12 November 2021

Contract Term:

The Contract will remain in force for a period of 24 months from the date the Contract is entered into.

: